Save and Save As#
The Distribution Job Editor chrome (the band across the top of the editor, alongside the job's title, Job Options, and Discard) carries the Save Changes control. Selecting the caret beside it opens Save As, which saves a copy of the distribution job under a new name instead of overwriting the one you have open.
Before you begin#
- Have a job open in the job editor with unsaved or previously saved content. Save As works whether or not you currently have unsaved changes.
- Know the folder the job lives in: the new copy is created alongside the original, in the same folder.
Save Changes (unchanged)#
Selecting Save Changes writes your edits back to the job you have open. The job keeps its name and identity; only its content is updated.
Save As: create a copy#
- In the job editor chrome, select the caret beside Save Changes.
- Select Save As….
- Enter a name for the copy. The editor suggests
Copy of <current name>; replace it with anything that is not already used by another item in the same folder. - Confirm. Reportworq creates a new job with that name from the job's current content (including any changes you have made in this editing session, saved or not), and the job editor switches to editing the new copy.
The original job is left exactly as it was last saved. Save As never overwrites it and never renames it. After Save As completes, Save Changes in this editor tab now saves to the new copy, not the original. If you want to keep editing the original job, open it again from the workspace.
When to use it#
- Create a variation of an existing job (a different region, department, or format) without touching the one already in production.
- Checkpoint before an experiment. Save As before making a risky change, so the last-known-good version stays available under its own name if you want to go back to it.
- Start a new job from an existing one that already has most of the reports, parameters, or distribution setup you need, rather than building from scratch.
Notes and limits#
- The new name must be unique within the destination folder; Reportworq rejects a name already used by another item there.
- Save As always places the copy in the same folder as the original. Move or rename it afterward from the workspace if it belongs somewhere else.
- Run history, schedules, and audit log entries belong to the original job and are not copied: the new job starts with a clean history.
Related topics#
Feedback on this page
Comments, questions, requests, or something missing or unclear? Email us - the page you are on is filled in for you.
Email feedback on this pageOr write to support@reportworq.com directly.